2024 ProjectsDesigning for Sturgeon Passage in San Joaquin Eastside Bypass (Phase 2) Project Lead: US Fish and Wildlife Service Location of Project: Latitude: 37.205082, Longitude: -120.697574 Description of Project: Although SJRRP actively monitors Chinook...
Back to Funded Projects
Native Fish Passage in San Joaquin River at Eastside Bypass Control Structure
Native Fish Passage in San Joaquin River at Eastside Bypass Control Structure Project Lead: US Fish and Wildlife Service Location of Project: Latitude: 37.205082, Longitude: -120.697574 Description of Project: For over 60 years, the San Joaquin River saw no...
Designing for Sturgeon Passage in the San Joaquin River at Eastside Bypass Control Structure (Phase 1)
Designing for Sturgeon Passage in San Joaquin Ease Bypass (Phase 1) Project Lead: US Fish and Wildlife Service Location of Project: Latitude: 37.205082, Longitude: -120.697574 Description of Project: Although SJRRP actively monitors Chinook Salmon, little is...
Applying FISHPass In the Smith River Watershed
Applying FISHPass In the Smith River Watershed Project Lead: Ross Taylor and Associates Location of Project: Smith River watershed in Del Norte County, California. (41.79558, 124.05775 at South Fork confluence.) Description of Project: The primary objective of...